Custom fitted wardrobe: measure the room and agree the handover

Choose storage from the finished room and real belongings. Confirm internal dimensions, materials, fixing, complete installation scope and a checkable handover before manufacture.

Houseline editorial team · Last updated
Household unpacking boxes while planning storage in a flat

Start from the belongings and the usable room

A fitted wardrobe should answer a storage problem in a particular room, not merely fill a wall on a drawing. List the items that must fit: hanging clothes at their real lengths, folded items, bags, bedding, cleaning tools or a suitcase. Decide which items need daily access and which may go high up. Then stand where a person will actually dress, open every room door and window, and trace the route around the bed. A floor-to-ceiling rendering can look generous while leaving a drawer unable to open or an air-conditioner impossible to service.

Before paying a deposit, decide whether a smaller movable wardrobe would solve the problem with less disruption. A fitted unit can use an irregular wall, but it also ties the room to one layout and may complicate future work on sockets, damp patches or pipe access. The Consumer Council has reported disputes over furniture dimensions and custom specifications; its examples show why a visual impression is a weak substitute for written, measurable requirements. Define the needed function first, then ask suppliers to show how their drawings meet it.

Consumer Council: furniture quality and dimensions

Measure the finished space, not a brochure plan

Measure the actual room after floor and wall finishes are complete. Record width at several heights, the lowest ceiling point, skirting, beams, columns, uneven corners, socket and switch positions, window handles, curtain tracks, air-conditioner access, and any access panel. Mark the full sweep of doors and drawers, including the space needed for a person to stand in front of them. A plan may give a starting estimate, but installers should take and confirm their own final site measurements before manufacture. Agree who owns a mismatch between their drawing and the completed room.

Ask for a dimensioned plan and elevation showing overall external size and the usable internal width and depth of each compartment. Internal space shrinks with side panels, backs, hinges, runners and door mechanisms. A deep-looking cabinet might still be poor for hanging clothes if the door or internal fittings take up the clearance. Verify the most awkward object, such as a suitcase or long coat, against the finished internal dimensions rather than the outer frame. Keep a copy of the approved drawing with the order; it is the reference for any later change.

Specify materials and safety as delivered features

State the material for each visible and hidden part: doors, carcass, shelves, back, edge finish, hinges, runners and handles. Ask for samples or the supplier's exact specification, including the thickness and finish the quote assumes. The Consumer Council has documented a custom wardrobe dispute where a customer believed previous furniture specifications would carry over, but key thicknesses were absent from the order. That case illustrates a general evidence gap; it does not set a universal preferred panel thickness. Put your own choices on the signed drawing and invoice.

New composite-wood furniture and finishes can emit formaldehyde and other volatile compounds. The Indoor Air Quality Information Centre advises selecting low-formaldehyde panels and low-emission paints or adhesives, specifying these in the service agreement, and allowing new furniture to air out with suitable ventilation. Ask the supplier for product information rather than treating an unverified green label as proof. Also specify how the wardrobe is secured, which surface it will fix to, and who checks that the proposed fixing suits that wall. If a child might climb or pull a door, stability and daily access matter as much as appearance.

Consumer Council: custom wardrobe specification dispute

IAQ Centre: new furniture and indoor air quality

Compare a complete quotation

Compare suppliers on the same drawing and the same scope. The price should identify site measurement, fabrication, delivery, lift booking or stair carry, protection of existing finishes, assembly, wall fixing, disposal of packing, and defect correction. Ask whether a different panel, extra drawer, changed hinge or uneven wall creates a variation, and require a written price and revised drawing before approving it. A cheap base cabinet can become the dearer order if essential installation tasks or hardware are excluded. Confirm the payment stages and whether a manufacturing start makes changes or cancellation costly.

Delivery timing has several dependencies: final site measurement, drawing approval, fabrication, building access and any preceding renovation. A date that starts only after drawing sign-off is different from a date starting at deposit payment. Ask who informs the building management about drilling or delivery rules, and who resolves a product that cannot pass through a lift or room doorway. For a rental home, obtain landlord consent for any fixing and clarify reinstatement before ordering. These are practical contract conditions, not assumptions that every building or tenancy has the same rules.

Use a worked design comparison

Imagine a bedroom where the bed leaves a narrow passage in front of the intended wardrobe wall. Proposal A uses outward-opening doors and several deep drawers. Proposal B uses sliding doors, fewer drawers and a removable upper shelf. Assume the owner wants to store long coats and a suitcase and must still reach an air-conditioner service panel. Do not choose B solely because its doors avoid the passage: its track reduces usable depth and its upper shelf may obstruct the service opening. A plan view and front elevation should show both proposals at full operating positions.

Ask each supplier to mark the clear passage with doors or drawers open and to show where the long coats and suitcase actually go. If A blocks the route, redraw it. If B hides the service panel, shorten or move the cabinet and measure again. The useful comparison is storage that can be accessed, a room that still works and a known installation price. The example uses hypothetical layouts, not an advertised offer or a claim that sliding doors are always better. The winning design is the one whose real clearances can be checked in the finished bedroom.

Inspect the completed unit before final acceptance

At delivery, compare the unit with the approved drawing and order. Check each compartment, material finish, edge treatment and hardware; operate doors and drawers through their full travel with the bed and other furniture in place. Look for rubbing, uneven gaps, exposed sharp edges, loose shelves and blocked sockets or access panels. Ask the installer to demonstrate the fixing and explain any limits on shelf loading or cleaning. Photograph defects before the crew leaves and put an agreed remedy and date in writing, rather than signing a blank completion slip.

Keep the invoice, drawings, material information, warranty terms and installer contact. Clarify whether a future hinge adjustment or water-damaged panel is covered, who makes the visit, and whether a call-out fee applies. Ventilate the room as the material guidance suggests, but do not claim a personal smell check proves a measured emissions level. If a strong odour persists or a family member feels unwell, seek advice and ask the supplier for the exact products used. A useful handover establishes that both the furniture and the room can be used safely and comfortably.

Protect access to services behind the cabinet

A fitted cabinet can conceal a problem for years if it covers a socket, shutoff, inspection panel or damp external wall. Mark those locations on the approved plan and ask how each remains reachable without destroying the wardrobe. If a removable panel is proposed, have the installer demonstrate its removal after the cabinet is filled. Check that a window can still open to its intended position and that curtains, electrical plugs and air-conditioner servicing do not depend on dismantling the unit. The owner should also keep a simple record of what sits behind the cabinet for future repairs or a later sale.

Make the order decision explicit

Before authorising manufacture, ask one person in the household to run the daily sequence: enter the room, reach clothes, open drawers, make the bed, operate the window and reach any maintenance panel. Another person should compare that sequence with the drawings and the measured site. Record unresolved assumptions, such as a pending floor finish or landlord consent. A final drawing signed after the last measurement should replace earlier sketches; otherwise a correction may be treated as a paid variation rather than part of the original order.

If the supplier cannot show usable internal dimensions, identify the specified boards and fittings, explain fixing to the real wall, or price the complete installation, postpone the order. You can compare flats and room dimensions on Houseline while deciding whether the existing bedroom suits the wardrobe you need. The decision is complete when the room can accommodate the installed cabinet, the products and price are documented, and the acceptance test is agreed. A pleasing image is helpful for design discussion, but the written measurements and finished operation determine whether the purchase works.

Compare rooms on Houseline