Home insurance before a flat renovation: notice, vacancy and liability
Tell the insurer what work will be done and whether the flat will be empty, then obtain written answers on contents, improvements and liability. Check the contractor's policy separately and revisit the answers if the project changes.

Describe the project to the actual insurer
Having home insurance does not establish that every event during demolition, rewiring, plumbing work or a temporarily empty flat is covered on existing terms. Before work begins, compile the scope, contractor details, planned start and end, any change to structure or use, who will live in the flat, and what possessions remain. Send this to the current insurer or licensed intermediary. Ask for a written response under the policy in force: whether advance notice is required, whether an endorsement or additional premium is needed, which events remain covered, what is excluded, and what excess applies. A generic question such as “Does insurance cover renovation?” is too broad to give a useful answer.
The Insurance Authority advises policyholders to notify insurers about changes such as interior decoration that may increase risk; failure to notify can affect a claim. It also flags structural alterations and fire safety requirements. That guidance does not mean every paint job is automatically excluded or every renovation inevitably raises the premium. It means the insurer must assess the actual work against the actual contract. Update the description if the scope changes from painting to moving plumbing or altering a kitchen. Keep the disclosure, written reply and any revised schedule together so the record shows what was known before a loss occurred.
Separate contents, improvements and structure
The Insurance Authority describes common home contents cover as applying to household possessions and interior decoration, subject to definitions, item limits and overall benefit limits. Original floors, walls, ceilings, tiles, doors and windows supplied by a developer may be treated differently from owner improvements; some products offer buildings cover separately or as an option. During renovation, classify what will be removed, stored, left in place or newly installed. Ask whether an old sofa, the existing bathroom finish and a new cabinet awaiting installation sit within the same insured category. Do not assume that an attractive aggregate sum answers each question.
Imagine that work on a bathroom damages an old cabinet, the neighbour's ceiling and newly delivered fittings. Different property and legal interests may be involved. Ask the insurer about the event that caused each loss, the definition of insured property, the per-item limit, the excess and any condition on professional work. The Authority says some home policies offer accidental loss of contents during interior decoration as an optional benefit. “Comprehensive” in a brochure is not a substitute for the wording of the policy or a written endorsement identifying this project. Keep a dated inventory and photographs of significant possessions before they are moved.
Count vacancy using the policy's rule
A family may live elsewhere while a whole flat is renovated. The Insurance Authority identifies unoccupancy as a common exclusion and describes 30 consecutive days as a common limit, while stressing that the specified period belongs to each individual policy. The days before work, time waiting for materials, defect repairs and a delayed return may all matter. Ask the insurer when its clock starts, what counts as occupied and whether a brief visit changes anything. Do not infer from a contractor's planned working days that the property's vacancy condition is satisfied.
For example, a family expects to leave for 25 days, then delivery delays its return by 12 days. The absence is now 37 days in this illustrative timeline; neither number is a promised allowance under any policy. If the actual wording imposes a 30-day threshold, discuss the extension with the insurer before it is reached and obtain its decision in writing. A visit to check the work should not be treated as a reset unless the insurer confirms that interpretation. A dated schedule showing departure, site access, revised completion and return helps make the question concrete.
Check liability without merging different policies
If water escapes into the flat below or an object falls from a window, the question is who has legal liability to the affected person. The Insurance Authority says third-party personal liability is common in home policies, but the insured person, covered event and exclusions remain policy-specific. It does not follow that a household policy pays for every loss caused by a contractor, or that a contractor's insurance eliminates every risk to the owner. Request the insured names, work address, policy dates, activity description, liability limits, excess and key exclusions for each relevant policy.
Ask the contractor for current evidence of cover and a schedule showing the work actually proposed. If plumbing, electrical work or demolition is subcontracted, ask whether the arrangements extend to those firms and their work. A photograph saying “insured” gives little information about this flat and this period. Employees' compensation insurance for injuries to workers is a different question from damage to the owner's contents or a neighbour's property. Treat the categories separately in the project file. The insurance check should sit beside proper contractor selection, statutory approvals and safe site practice, rather than being used as a replacement for them.
Build an incident-by-incident comparison
Make a simple matrix with rows for old contents damaged during work, newly installed improvements, original building fabric, damage to a neighbour, injury to a worker and theft while the flat is empty. For each row write the possible policy, insured person, limit, excess, notice requirement and an unresolved question to send to the insurer. The matrix is a way to ask better questions; it is not a declaration that a particular claim will be paid. In the works contract, state when insurance evidence must be provided, how changes are notified and who makes the first emergency and insurer calls after an incident.
Consider two contractors: one quotes less but cannot identify relevant cover during the works; the other provides documents, whose terms still need checking. Neither price nor the thickness of an insurance file establishes the right decision. If your own insurer requires an endorsement, include its cost and conditions in the renovation budget. If a proposed activity is excluded, adjust the scope or secure suitable cover before work rather than rely on an informal promise. Ask whether the contractor's certificate names the right entity and whether the effective period actually spans the planned and plausible delayed completion dates.
Follow a project that changes midway
Suppose an owner renovates a kitchen and bathroom, moves the family out and leaves an old sofa in the living room. The contractor will alter water pipes and some fixed wiring. The owner should disclose the scope and vacancy to the existing insurer, then ask about the sofa, existing fit-out, work in progress and third-party liability separately. The contractor should provide evidence of its project and liability cover. If the reply is that “home insurance usually covers it,” ask which clause, which insured person and which event that statement means. This is an example, not a claim about a live policy.
Halfway through, a concealed pipe requires more work and the family cannot return as planned. Recalculate the consecutive vacant days, send the revised scope and ask for an updated written answer. If a wall already showed seepage before the project, record it as a pre-existing defect rather than treating later discovery as a new accident. The Insurance Authority identifies pre-existing losses as a common exclusion. This example makes no assumption about a premium, limit or eventual claim result. Each depends on the purchased wording, the cause of loss and the insurer's assessment of evidence.
Respond to an incident and close the record
If an incident occurs, first protect people and stop further damage where it is safe to do so. Photograph the affected area, preserve dated messages, work logs, damaged-item details and invoices, and notify the relevant insurer and contractor promptly in the manner required by their policies. Do not throw away evidence or decide responsibility solely from the first visible leak. The Insurance Authority warns that for a third-party claim the policyholder should not admit liability or privately settle with the claimant in a way that breaches the claims procedure. Pass the neighbour's demand to the insurer for proper handling.
At completion, tell the insurer what was actually changed and when the family returned. Ask whether the improved interior needs a revised contents value or buildings arrangement, and keep the new schedule, endorsement, works contract and acceptance record. Insurance does not legalise a building change: an open kitchen, for example, still needs to satisfy applicable statutory and fire safety requirements, as the Authority notes. When comparing homes, an expected renovation's timing, temporary accommodation and coverage cost belong in the overall decision. The useful document is the insurer's answer about this project, not a pile of generic product pages.