An MBIS notice arrives: what should a flat owner do before paying for building repairs?

Verify the notice and its scope, ask the owners' corporation for an appointment and inspection timetable, then separate the registered inspector's findings from any repair quotation. The notice has different general deadlines for common parts and individual premises.

Houseline editorial team · Last updated
Owner working through building costs with documents and a calculator

Start with the actual notice

A Mandatory Building Inspection Scheme notice is a demand to arrange a prescribed safety inspection, and any prescribed repair found necessary, for the part of a building named in that notice. It is not itself a contractor's bill or proof that every proposed improvement must be bought. Read the addressee, building, affected parts, notice date and required steps before discussing money. The Buildings Department describes the scheme as applying to buildings aged thirty years or above, apart from domestic buildings not exceeding three storeys, once statutory notices are served.

Keep a copy of the notice and its envelope or electronic delivery record. Ask the management office or owners' corporation whether the notice concerns common parts, an individual premise, or both, because the work route and general time limits differ. A notice about common parts is normally organised collectively; a flat owner should still understand the project's cost and decision process. If wording or ownership is unclear, seek an explanation from the Buildings Department rather than assuming that a poster in the lobby is the entire legal requirement.

Buildings Department scheme overview

Verify status without overreading the search result

The Buildings Department has a public search for issuance and compliance status of building and window inspection notices. Search by notice number, address or building name, then match the result to the actual notice. The department says recent notices may not yet appear and its database is updated on the first and third Wednesday of each month. Therefore a blank result is a reason to check further, not proof that a document in hand is false or a duty has vanished.

Ask the owners' corporation for the received notice, correspondence with the department and any request for an extension. Record which part of the building each document concerns. Do not confuse a Mandatory Building Inspection Scheme entry with a Mandatory Window Inspection Scheme entry or a fire safety direction: each has a different subject and process. If a seller or agent provides only a screen capture, obtain the underlying notice and the latest project record before treating the matter as settled.

Search notice status and read its caveats

Map the deadline to the part named

The department's general timetable runs from the statutory notice date. For common parts it lists five months to appoint a registered inspector, nine months for the prescribed inspection and twenty-four months for a necessary prescribed repair. For an individual premise the corresponding periods are three, six and twelve months. These are general periods, so use the actual notice and any formally confirmed change for the building's working calendar. Do not count from the date a management circular reaches your letterbox.

A practical schedule has separate columns for appointment, inspection, decision on repair, contractor appointment and completion documentation. The inspector needs time to see relevant areas and produce findings; the owners may need time to approve expenditure or arrange access. If the first appointment date is already close, ask what has been done and what evidence exists. The existence of a quotation alone does not establish that a registered inspector has completed the prescribed inspection.

Buildings Department general time frame

Know who may inspect and who may repair

The owners or owners' corporation appoint a registered inspector for the prescribed inspection. Where prescribed repair is needed, a registered contractor with the relevant qualification carries it out under a registered inspector's supervision. The Buildings Department's process shows an inspection report and certification before the branch between no prescribed repair and repair required. At completion, the supervising inspector submits the required report and certificates. Ask for the professional's registered name and role rather than relying on the logo of a company that sent a sales leaflet.

A project may also contain optional cosmetic work, access scaffolding or unrelated upgrades. Those can be legitimate choices, but they should be visible as separate scope and cost lines. Request the inspector's defect findings, proposed method, reason for each item, and which items are necessary to comply with the notice. If owners are invited to approve a combined package, ask for the split before voting or budgeting. A contractor's commercial recommendation is not a substitute for the inspector's technical conclusion.

Owner and corporation action sequence

Read the papers before approving a call for funds

Build one file containing the notice, inspector appointment, inspection report, any repair specification, tender documents, comparative quotations, meeting papers, resolutions and payment requests. For each proposed payment, identify the payee, work stage, cost basis, due date and what proof of completion will follow. Where a management company quotes an amount per flat, ask to see the allocation rule and the arithmetic rather than treating an average as the final liability for every owner. The governing building documents and approved resolutions matter to that allocation.

Separate safety urgency from financial opacity. If the inspector identifies a hazard needing prompt protective measures, ask the corporation how it will address it while keeping the expenditure trail clear. Conversely, a broad description such as external wall repair does not tell an owner whether the tender covers inspection, access, substrate repair, finishing, or contingency. Each item affects how competing bids can be compared and how later variations will be checked. Keep questions in writing so answers reach all owners consistently.

Worked situation: a repair demand arrives before the report

Suppose a flat owner receives a payment request headed building inspection and facade works, while the notice search shows a live entry for common parts. The useful first question is which amount pays for the registered inspector's prescribed inspection and which amount is only a provisional repair budget. Ask for the actual notice date, the inspector appointment and the inspection report or expected report date. A contractor quote issued before the report may help preliminary planning, but it cannot by itself show which repairs the prescribed inspection will require.

If the report later identifies concrete defects, compare the repair specification against those findings, then compare tender bids against the same specification. Add any access or contingency allowance explicitly. This sequence lets the owner see a possible cash need without representing an estimate as an approved final cost. If no prescribed repair is required, the department's process has a route for inspection certification; owners should ask for the completion evidence rather than paying a repair line simply because it appeared in an early budget.

Questions for an owner buying or selling mid-project

A buyer of a flat in a building with an open notice needs more than a statement that the building is undergoing works. Ask what has been served, what stage the project has reached, what sums have been approved or demanded and whether further estimates are pending. A seller should provide the documents available, distinguish paid contributions from future calls and have the sale agreement address allocation with the transaction professionals. Public notice status is useful context, but it does not calculate a particular flat's contribution or replace building accounts.

Where the project spans a completion date, put the known payment dates and unresolved liabilities on a timeline. A buyer can then plan cash for contributions alongside the purchase, and a seller can avoid treating an unapproved budget as an invoice already due. If no one can produce the notice or inspector's report, mark the point unresolved and seek clarification before committing to a price or completion arrangement. This is a document question that can materially change a home decision.

Close the file only with evidence of completion

After inspection or repair, ask for the registered inspector's relevant report and certificates, the contractor's completion record where work was done, final accounts and the department's compliance position. Check that the documents refer to the same notice and building parts. A final payment request and a newly painted wall do not alone establish formal compliance. Keep the file with the property's other ownership papers so the next owner can understand the history without reconstructing it from scattered circulars.

If the public search has not yet changed, remember its update cycle and ask the corporation for the submission and correspondence rather than declaring failure. If the notice remains outstanding or a deadline seems impossible, contact the Buildings Department with the notice reference and ask what procedural action is required. Owners can press for a credible schedule and transparent accounts while the registered professionals handle the statutory inspection and repair certification.