Will this office delivery route work for your actual shipments?
Before leasing an office that receives equipment or frequent goods, verify the vehicle bay, receiving hours, goods lift, internal route, booking rules and full cost with a realistic delivery.

Translate the business into a delivery test
An office can have an impressive lobby and still be difficult to furnish or replenish. Start with what will actually arrive: boxed computers, furniture, samples, supplies or bulky equipment; how often; and whether the sender uses a courier, light van or larger goods vehicle. Record the largest ordinary package and the occasional exceptional item separately. Ask whether deliveries must be signed for, held securely or taken straight to the suite. The right question is whether a planned shipment can move from the public road to the correct room within the allowed hours, not whether a brochure says that the building has loading.
Talk to the people who will perform the route. A removal company, furniture supplier or regular courier can identify vehicle size, trolley use, manpower and realistic unloading time. Ask a prospective landlord or manager for the current delivery rules before signing. The rules may distinguish small hand-carried parcels from palletised or oversized goods, and may require advance booking or contractor documents. Do not promise staff that a goods lift exists until you have identified the lift they may use and its actual operating schedule.
Follow the complete path in person
Walk from the legal stopping or loading point through the building entrance, security desk, lift lobby, goods lift and corridor to the proposed suite. Note kerbs, steps, doors, tight bends, floor transitions and any need to pass through a public lobby. Measure the widest and tallest package, the trolley and the lift opening against the narrowest point; the lift car alone may be generous while its door is not. Check whether there is a protected place to pause without blocking an exit. If items arrive on a rainy day, ask which covered path is actually permitted rather than assuming a driver can wait at the front door.
Inspect the receiving area during the time deliveries normally occur. A bay that is empty at a quiet viewing may be fully booked on workdays. Ask how vehicles queue, whether a barrier pass is needed, who admits the driver and whether a guard may refuse an unbooked vehicle. Determine whether a supplier must unload into a common loading dock and move the goods separately, and who bears the risk while items wait. These are operational facts for this building. Transport Department design guidance describes how access and loading facilities should be planned, but it does not promise a tenant unrestricted access to any individual bay.
Transport Department planning manual, vehicle access and loading design
Check vehicle fit and the approved arrangement
For frequent larger deliveries, establish the vehicle class, height and turning route rather than relying on the word “van.” The Transport Department’s planning annex sets different standard stall sizes and headroom for private cars and light goods vehicles; its manual cautions that existing constrained facilities need site-specific judgement. A car bay therefore cannot be assumed suitable for goods unloading. Ask the building for the actual posted limits, loading-bay dimensions and route plan, then confirm the chosen supplier’s vehicle fits. A narrow entrance or turning circle may be decisive even where the bay itself is long enough.
If marketing shows a dedicated loading entrance or goods lift but the site has been altered, request the approved building plan or management plan that identifies the facility and its permitted use. The Buildings Department explains that building records can be viewed and compared with the premises when a discrepancy is suspected; a qualified professional should interpret any proposed physical change. A tenant should not move barriers, widen a door, occupy an exit or convert a parking space simply because delivery access is inconvenient. The landlord and management should explain any difference between the plan and the operating route before it becomes a lease commitment.
Buildings Department guidance on comparing premises with records
Turn access rules into lease terms and a cost comparison
Ask who can book the bay and lift, how far ahead a booking is needed, what times are available, and what happens if a delivery arrives late. Check whether there are loading fees, lift protection or deposit charges, security paperwork, overtime staff fees, removal of packing waste and limits on weekend work. A low base rent may be less useful if routine shipments require repeated out-of-hours bookings or extra carriers. Distinguish charges set by the building from delivery costs set by the courier. Request the written current schedule and a clear process for future changes.
The lease or a signed side schedule should identify the access the landlord can actually grant. Building management may control common bays and lifts; an owner cannot necessarily guarantee exclusive use. Avoid language that simply promises “goods lift available” without hours, booking process or the capacity needed for the expected cargo. For a business whose operations depend on daily receiving, negotiate a workable written right or choose another office. For an occasional move-in delivery, at least make the required booking and cost explicit before fixing the commencement date.
A useful comparison calculates an ordinary month and a move-in month separately. The ordinary month captures repeated receiving, a failed attempt, return handling and any extra trip when the bay cannot be booked. The move-in month captures lift padding, security staffing, waste removal and the time the contractor may be on site. Ask whether the building permits the delivery team to use its own trolley and whether it requires floor protection. These are questions for the building and supplier, not universal charges. Record the answer against the exact suite and date so a later change of tenancy or management instructions does not become invisible.
Use a worked shipment to expose the gap
Consider a design studio that receives sample cartons each week and needs one large equipment delivery on move-in. An office near transit looks attractive, and the agent points to a goods lift. The studio asks its carrier for the vehicle and package dimensions, then walks the route with management. Small cartons can be signed for at reception during ordinary hours, but the large item needs a booked bay, lift padding and a corridor turn that has not been tested. The office is suitable only if the supplier and manager agree a safe route and the studio budgets the booking and handling. A front-lobby photograph does not resolve that gap.
Now compare an alternative office with a less polished reception but a receiving desk that accepts the studio’s normal cartons and a documented route for large items. Add rental and handling costs over the expected operating pattern rather than judging one spectacular move-in. If the business can change the shipment to smaller modules, ask the supplier whether that is feasible and what it costs. If it cannot, the route is a property constraint, not an inconvenience staff should improvise around on delivery day.
Make the handover test repeatable
Before signing, keep the site plan, permitted vehicle classes, measured pinch points, current booking rules, charge schedule and the name or role of the person who confirmed them. Ask the landlord to record any agreed access condition in the transaction documents. Before the first delivery, send the supplier the building instructions and book the bay and lift; identify who meets the driver and signs for goods. At move-in, test with a representative shipment and record any obstruction or rule that differs from the agreement. Escalate through management before a driver blocks a street or a fire exit.
Operations can change after the lease begins. Assign an office contact to keep booking details, new notices and a fallback delivery arrangement current. If a lift is out of service or a bay is closed, ask management which authorised route remains and whether a delivery must be rescheduled. A reliable receiving plan includes the ordinary route, an exception route and responsibility for costs. When comparing commercial spaces on Houseline, carry this route test into every viewing so an attractive floor area does not hide an unusable supply chain.