Office fit-out before leasing: check rooms, fire systems and power

A fitted office may need building, fire and electrical work before it serves your team. Resolve the scope, records, cost and timetable before signing.

Houseline editorial team · Last updated
Office desks and a glass meeting room

Make the proposed layout a lease decision

A fitted office can look ready to occupy while your own desks, meeting rooms and equipment require new partitions, electrical points or changes around sprinklers. Before signing a lease, draw a simple proposed layout over the actual measured unit and ask the landlord and building manager which parts can be altered. The decision is not simply whether the rent fits the budget. It is whether the proposed use and fit-out can be delivered lawfully, safely and by the date the business needs the space. Keep a written list of work the landlord will provide, work the tenant will procure, and conditions that must be resolved before possession.

Separate loose furniture from work on the building. Movable desks and free-standing shelves may be straightforward, while a new solid partition, fixed wiring, suspended ceiling or moved sprinkler can involve different specialists and records. Do not accept a contractor’s single line marked “office renovation” as proof that all routes have been assessed. A clear scope lets the tenant compare quotes, obtain the right consents and avoid paying rent during a fit-out that could not proceed as planned.

Buildings Department minor works items

Fire Services Department guidance

Check the building and tenancy boundaries

Ask for the relevant approved layout or existing fit-out records and compare them with the unit you viewed. Identify the demised premises, entrance, common corridors, service risers and any ceiling or plant space that the tenant cannot control. Confirm in writing whether the landlord’s consent is needed for partitions, floor penetrations, signage, new circuits or access outside normal hours. A landlord’s permission and a statutory works route are different matters; both may be needed. The lease should say who obtains approvals, who pays related professional and management fees, and whether an unsuccessful approval affects the start date or the right to withdraw.

The building manager may also control lift booking, delivery hours, protection of common areas and a renovation deposit. Request those rules before agreeing a contractor programme. If the lease offers a rent-free fit-out period, check the exact start and end dates, permitted access and what happens if a building controlled approval is delayed. An attractive free period is less valuable when the tenant cannot begin work. These are transaction terms to negotiate against the specific building documents, not universal statutory allowances.

Buildings Department procedure overview

Buildings Department works categories

Classify partitions before pricing them

Buildings Department lists particular partition wall works inside domestic and non-domestic flats under the Minor Works Control System, with categories determined by characteristics of the proposed wall. Its page includes specific non-domestic flat items. The category of a proposed office partition cannot be chosen from its appearance or from an agent’s description. Give a qualified building professional or prescribed registered contractor the wall length, height, weight, materials, position and current drawings. Ask them to identify the applicable item, required submission route and whether the design affects structure, fire resisting construction or means of escape.

A glass meeting room or a block wall may create different questions, and a wall that appears light can still affect sprinkler coverage or escape width. A contractor’s quotation should distinguish design review, required professionals, statutory submissions, physical work and completion records. If the planned wall cannot be justified in the proposed location, revise the layout before committing to custom furniture and cabling. The answer to “can we add a room?” belongs in the actual plan and professional assessment, not in a generic promise that office partitions are always minor works.

Buildings Department partition wall items

Minor works procedures

Map every fire installation affected

Walk the proposed layout with the current positions of sprinkler heads, detectors, alarms, hose reels and exit signs marked. Fire Services Department warns that false ceilings, partitions, air ducts and stored goods can obstruct a sprinkler’s intended coverage. A new meeting room can create a blind area even when no sprinkler head is physically removed. Do not hide or move a fire installation through ordinary decoration work. If an alteration is needed, the department says it must be done by a registered fire service installation contractor, with the proper certificate issued and a copy forwarded to the Director of Fire Services.

The paperwork depends on what changes. The department’s FAQ distinguishes work with no change to the installation layout or fixed equipment from work that changes layout or location; for the latter it describes a compliance certificate and as-built layout plans in addition to FS 251. Ask the registered contractor to state the applicable route for this exact proposal, rather than assuming the smallest route. Budget for both design and reinstatement if the lease requires a different final condition.

Fire Services Department alteration and obstruction guidance

Treat fixed electrical work as a separate package

Extra workstations may need more than extension leads. List the actual equipment, positions and likely simultaneous loads, then ask a registered electrical contractor to check the existing installation and whether its approved loading is sufficient. EMSD says additions or alterations to fixed electrical installations must meet current safety requirements and be carried out by a registered electrical contractor. It also says completed work must be inspected and tested by a registered electrical worker before energisation and that a WR1 work completion certificate is issued. Put the inspection, test and WR1 in the electrical quote and handover list.

Do not treat an available socket as proof that a new server corner, pantry appliance or bank of desks can be supplied safely. Confirm whether the landlord, tenant or building operator controls the distribution board and who can authorise an outage. Mark any required power company loading application as a schedule dependency, not as a hidden contractor extra. The electrical scope should align with the final desk layout; otherwise a late change can undo finished walls and ceilings.

EMSD fixed electrical work guidance

Build one cost and programme sheet

Ask each bidder to price the same plan and separate demolition, partitions, fire installation work, electrical work, data cabling, ceiling work, protection of common areas, rubbish removal and final cleaning. Add professional design and submission fees, management charges, deposits and any after-hours access charges. Record who carries the risk if the building requires a changed design. The lowest construction subtotal may be the most expensive total if it excludes approvals or reinstatement. A quote should identify assumptions and exclusions so that each line can be tested.

Build a sequence rather than relying on one promised completion date: landlord consent and drawings, professional assessment, required submissions, building access, physical works, testing, certificates, defect correction and move-in. Ask which steps can run in parallel and which cannot. If a proposed lease commencement date arrives before a required approval or safe energisation, the business may pay for space it cannot use. Resolve that commercial risk with the landlord before signing, rather than hoping the contractor will accelerate statutory steps.

Buildings Department procedure route

EMSD certificate requirement

FSD certificate route

A worked office choice

Suppose a small team is comparing Office A, which already has a meeting room, with Office B, an open floor that appears easier to arrange. Both are assumed to have the same rent and lease length; no live offer is being quoted. The team wants a closed room, six additional fixed power points and a lowered ceiling for lighting. Office B’s proposed wall and ceiling may affect sprinkler coverage, and its electrical additions need a registered contractor’s assessment. The team should obtain a marked plan and priced professional scope before treating B as the cheaper or faster choice.

If the registered specialists confirm a viable route, compare the full fit-out cost and usable date against Office A’s existing layout. If a required sprinkler change or power upgrade is uncertain, negotiate a condition or choose a layout that avoids the unresolved work. Record who owns new installations and who must remove them at lease end. This example is a way to make the decision, not a statement that either real building requires a particular statutory submission. Actual works classification follows the measured unit and professional advice.

FSD sprinkler guidance

BD partition items

EMSD electrical guidance

Handover should include documents and a usable room

Before the tenant’s staff occupy the redesigned office, inspect the completed layout against the agreed plan. Check doors, escape routes and that the fire equipment is visible and unobstructed. Obtain the registered fire installation contractor’s applicable completion records, the electrical WR1 for fixed electrical work, and the relevant minor works or building records identified by the appointed professional. Ask for as-built drawings where changes were made; they will matter during maintenance and at lease exit. Record defects with a date and the party responsible for correction.

Finally, match the finished space to the lease: permitted use, rent commencement, work ownership, reinstatement and any deposit release. If a document is missing or an installation is still under test, do not silently call the fit-out complete. Keep a single file with landlord consents, building management rules, quotes, change orders, certificates and photographs of the final condition. The reliable office choice is the unit whose desired layout can be delivered and evidenced within the agreed budget and timetable.