Can you rent a fitted office and convert it into a restaurant?
An office fit-out and a willing landlord do not establish food-premises suitability. Define the operation, check land and planning restrictions, test a proposed layout and sequence the lease around real licensing conditions.

Define the food operation before choosing a unit
An office-looking unit is not automatically a restaurant just because it has water and a landlord willing to lease it. First write down the intended operation: preparation method, cooking fuel, seating, sale of meals or unbottled drinks for consumption on site, opening hours, extraction and deliveries. FEHD says a restaurant licence is required for a business selling meals or unbottled non-alcoholic drinks for consumption on the premises, subject to the definition and applicable exceptions. Other food trades have different licences. Show that operating description to FEHD or a qualified licensing adviser before relying on a casual label such as café or takeaway. The specific business model drives the layout, health, fire, building and ventilation requirements. A short lease for an office does not make restaurant use lawful or technically feasible. [FEHD licensing FAQs](https://www.fehd.gov.hk/english/licensing/QA_collated.html); [FEHD licence guide](https://www.fehd.gov.hk/english/licensing/guide.html).
Check permission at three different levels
For the exact premises, obtain the relevant Government lease and land documents and ask whether the intended restaurant use complies. Check the statutory plan with the Planning Department, and examine the building's approved use and relevant building records. FEHD states that food-business applicants must ensure compliance with Government lease conditions and statutory plan restrictions and that premises are free of unauthorised building works. A landlord's phrase 'commercial use' does not resolve these distinct tests. Nor does a previous occupier's business name establish that your proposed operation is permitted. If a planning permission or lease modification would be needed, treat it as an unresolved approval and cost question, not a formality to be handled after signing. A professional can help interpret ambiguous documents, but the applicant should retain copies and record the conclusion for this address. FEHD specifically directs prospective operators to the Land Registry and Planning Department for these checks. [FEHD licensing FAQs](https://www.fehd.gov.hk/english/licensing/QA_collated.html).
Inspect the actual physical route to compliance
A restaurant needs more than a room large enough for tables. FEHD tells applicants choosing a ground-floor premise to consider water supply, proper sanitary fittings and capacity for ventilation. The layout also engages food rooms, toilets, exits, fire safety, drainage and possibly cooking fuel. Walk the unit with a person who can assess licensing and building constraints, then draw the proposed customer and kitchen flows. Note where extraction could discharge, where waste and grease would be handled, and whether the route would affect another occupier or common property. Do not assume an external duct can be cut through a wall or that a toilet can simply open into a food room. FEHD's layout guide lists common plan shortcomings, including unclear boundaries, missing food room, missing sanitary fittings and fuel type. It also gives examples of changes that may need referral to the Buildings Department or Fire Services Department. [FEHD layout guide](https://www.fehd.gov.hk/english/licensing/license_businessLayout.html).
Treat an existing licence as evidence with limits
If the unit once held a food licence, request its approved plan, licence type, address, conditions and status. Compare the approved boundary and layout with what you intend to rent, including any mezzanine, outside seating or store room. FEHD says a new application may be processed while a valid licence covers the premises, but the new licence is issued only after the old one is cancelled; documentary proof of sole control is needed before its letter of requirements in that situation. A former licence for a different food activity is not permission for an altered kitchen or fuel. FEHD also says an operator must not start business merely because an application for a provisional restaurant licence has been submitted; an actual full or provisional licence is needed. That makes the handover date, outgoing operator's cancellation, fit-out period and rental commencement commercial decisions to settle early. [FEHD licensing FAQs](https://www.fehd.gov.hk/english/licensing/QA_collated.html).
Use the proposed plan as a reality test
FEHD requires a plan with the application, drawn to scale and covering the whole food premises; its guidance specifies a metric scale not less than 1:100 for the proposed layout. Before a licence is issued, final layout plans must be submitted for approval and the premises must conform to them, subject to required amendments. A pretty interior rendering is not that plan. Mark walls, food preparation space, fixed equipment, sanitary fittings, entrances, exits and fuel where applicable. Ask the designer or authorised person to identify which changes touch building structure, means of escape or ventilation and need separate review. If the lease covers only part of a floor, delineate the exact boundary. If the landlord proposes a new partition or opening, price and schedule it as a conditional project, not as existing capacity. Plans that do not match the real site can delay or defeat the application. [FEHD proposed-layout requirements](https://www.fehd.gov.hk/english/licensing/license_businessLayout.html). Ask the proposed designer to compare the measured site with any approved building plan rather than drawing from the advertising floor plan alone. Record which parts are already approved, which are merely visible on site, and which must be created. This distinction helps prevent the tenant from paying for a layout that cannot be authorised. If a proposed kitchen wall, heavy appliance or changed exit triggers another department's review, identify that dependency before committing to a fixed opening date. The drawing is valuable because it exposes decisions that a glossy photograph conceals; it cannot itself grant the licence.
Build a cash timeline before signing
A food operator can pay rent while waiting for consent, works and inspections. Make a timeline with lease signing, vacant possession, design, application, landlord works, contractor works, required certificates, actual licence issue and opening. Ask what rent-free period, access right and termination arrangement apply if an essential approval is refused. Do not invent a standard processing period or assume an optional provisional licence will be granted automatically: FEHD describes the provisional route as available after essential health, building and fire safety requirements are satisfied. Include professional fees, ventilation, drainage, fire service installations and reinstatement obligations as possible cost headings, then obtain real quotes. A conditional offer should state which party supplies approved plans and previous compliance records. If the site needs major alterations, the apparent low rent may be outweighed by works and delay. [FEHD licensing FAQs](https://www.fehd.gov.hk/english/licensing/QA_collated.html). Keep the rent forecast separate from the fit-out budget. A landlord-funded improvement may still delay possession, while a tenant-funded improvement may need the landlord's consent and later removal. Ask whether the lease permits the proposed trade and physical works, and whether any agreed rent concession begins at signature, possession or approval. Those are contract questions, not FEHD promises. Put the answers in the draft lease reviewed by the parties' advisers instead of relying on an agent's verbal timeline.
Compare a worked office conversion
Suppose a landlord offers a fitted office with desks, a small pantry and attractive street frontage. The tenant wants to prepare hot meals and seat customers. The pantry sink does not establish that the proposed kitchen, ventilation, sanitary fittings, exit route, lease use and statutory plan will satisfy a restaurant application. The tenant first writes the actual food operation, obtains the land and building documents, checks the plan restriction, and asks a suitable professional to sketch a licensable layout. If the professional finds that an exhaust route would cross common property, the tenant asks the landlord and relevant authority about consent before treating the quotation as buildable. They seek FEHD guidance on licence type and conditions, then negotiate rent commencement and exit terms around approvals. The example gives no promise that this particular office can convert and no invented budget or licensing date. Its point is that a cheap fitted office can be more uncertain than a bare unit with a demonstrably suitable route.
Decide on a document-backed lease
Proceed only when the use documents, site constraints, proposed plan, responsibilities and licensing sequence are clear enough for the investment at stake. Write down every unresolved condition and who will obtain the answer. An agent can introduce premises but cannot grant a food licence or certify building compliance. The landlord can supply records and consent to works, but an applicant must still satisfy the licensing authority. If a critical use restriction or ventilation route cannot be resolved, choose a different candidate before becoming liable for long rent and reinstatement. [Houseline's commercial property search](/) can provide alternatives, but compare them against the same operational brief rather than assuming a property classified as commercial is ready for food service. Keep the final approved layout and licence with the business records so later changes are checked against the real approval.