Home living and property articles

Replacing a flat gas water heater: check the model, flue and installer
Before accepting a promised replacement, confirm an approved room-sealed model, a viable outdoor flue, registered installation and a testable handover.
Home and living · Read the article
First-hand flat defects after handover: send a written notice
Record each defect, serve the vendor a written notice within the contractual period after completion, and reinspect the actual repair before closing an item.
Buying · Read the article
First-hand flat material date: plan for the actual handover
The estimated material date is a project milestone. Follow the ASP, extensions and vendor notices before scheduling funding, ending a tenancy or booking a move.
Buying · Read the article
Moving a toilet or basin? Check the drainage design before renovating
A new bathroom layout may alter drainage and trigger minor-works requirements. Confirm the route, classification, contractor, waterproofing and completion records before demolition.
Home and living · Read the article
Landlord selling your rented flat: check viewings, rent and the deposit
A sale normally leaves the existing tenancy in place. Read the viewing and break clauses, verify the new rent route, and record exactly who will return the deposit.
Renting · Read the article
Leasing a fitted office? Walk the escape route before signing
Trace the route from each room to the ground-floor exit, compare the fit-out with approved records, and allocate work on doors, locks and obstructions before occupation.
Commercial property · Read the article
Loose or scorched wall socket at a viewing: verify repair before handover
Stop using the suspect outlet, document its exact condition, and ask a registered electrical contractor for diagnosis and a repair record before accepting handover.
Home and living · Read the article
Fire door not closing in a flat building: identify the door and verify repair
Identify the exact protective door, record the closing or escape fault without altering it, then ask the responsible party for a repair scope and a repeatable check.
Home and living · Read the article
Flat lobby access and intercom: test the daily route before handover
Test the correct resident and visitor routes, confirm card and app handover, and agree how a fault or old user access will be resolved.
Home and living · Read the article
Pipes knock when a flat tap closes: investigate before handover
A pipe knock when a tap closes calls for a reproducible symptom record, the right plumbing investigator and a handover test that checks the original fault.
Home and living · Read the article
Possible termites at a flat viewing: define the treatment before committing
If you see possible termite signs at a viewing, map the affected areas, obtain a professional treatment plan and agree on a testable handover condition.
Home and living · Read the article
Window water at a flat viewing: condensation or rain seepage?
Water beside a window can have several sources. Compare location, timing and weather, then require an investigation and repair record suited to the actual cause.
Home and living · Read the article