Use the official minor-works item catalogue
Similar work labels may correspond to different minor-works items. Describe the location, elements affected and proposed scope so an appropriate professional or registered contractor can check the official item descriptions and limits.

Buildings Department
Prepare for your task
| Task | Information to have ready |
|---|---|
| Work category | Describe the actual category, such as windows, drainage, external finishes, removal or interior work, rather than giving only a general renovation label. |
| Location and elements | Identify the unit or common parts and affected elements, gathering existing plans, observable information and known dimensions; leave unknown details for professional checking. |
| Description and limits | Have the responsible professional check the item's description, class and limits, rather than applying a similar item's identifier automatically to another project. |
| Procedure and forms | After confirming the item, check appointments, contractor registration scope, notices and completion documents against the quoted scope of work. |
Scope and arrangements
- The minor-works system still has prescribed personnel, procedures and documents; it does not mean every small renovation can be undertaken independently.
- Elements, location and scope can place apparently similar work under different items. Check the actual project information.
