Compare renovation quotations by work, quantity and exclusions

Align locations, work, quantities and material specifications before comparing totals. Resolve unclear items rather than treating a whole-home price as a complete scope.

Houseline editorial team · Last updated
Packing household belongings and boxes for a move

Give each quotation provider the same scope

Prepare one scope for all quotations. Removal, preparation, installation, disposal and cleaning can be separate tasks, whose inclusion needs confirmation rather than assumption.

Tie quantities and specifications to locations, measurements and selected models. Ask an appropriate professional about unclear work classifications or permission arrangements instead of deciding from the lowest total alone.

Make quotation items checkable

Use consistent locations and item names so different quotation groupings can be reconciled.

ItemRecordFollow-up
Location and workWhat is done and whereResolve omissions
QuantityUnit and measurement basisCheck quantity differences
MaterialsModel, specification and supplyMatch the material schedule
ExclusionsExtras, owner supply and changesInclude in the overall budget

Example: flooring quotations cover different work

One quotation lists installation; another also includes removing existing flooring and preparing the surface. Align the scope and specifications before comparing amounts, keeping unresolved work in the question list.

Records before accepting a quotation

  • One work and location schedule
  • Quantities, specifications and exclusions
  • Actual change and payment terms

Consumer Council: renovation quotation information

Total quoted and extra items

Organise material specifications

Build the renovation quotation comparison